Installation Is Quick And Easy With SQUARE FOOT® Footing Forms

1.)   Best Square Footing Form
SQUARE FOOT® and construction tube.
2.)   Best Square Footing Form
Cut off excess plastic at top of wedges to desired construction tube size.
3.)   Best Square Footing Form
Saw construction tube to desired length.
 
4.)   Best Square Footing Form
Attach construction tube to SQUARE FOOT® footing form with a minimum of 4, 1“(2.5cm)screws.
5.)   Best Square Footing Form
Level/plumb construction tube/SQUARE FOOT® footing form prior to backfilling.
6.)   Best Square Footing Form
Excavate hole to a depth to avoid frost penetration uder pier (Typically 5'(1.5m)).
 
7.)   Best Square Footing Form
Place SQUARE FOOT® and construction tube on undisturbed soil or 4“-6“(10cm-15cm) of compacted crushed stone or gravel.
8.)   Best Square Footing Form
Place SQUARE FOOT® footing form at desired location.
9.)   Best Square Footing Form
Construction tube and SQUARE FOOT® footing form combined cannot extend 36“ (91cm) or more above ground line/grade without being braced.
 
10.)   Best Square Footing Form
Backfill using shovel or backhoe.
11.)   Best Square Footing Form
Backfill making sure construction tube remains level/plumbed at desired location.
12.)   Best Square Footing Form
Invert spare SQUARE FOOT®; on top of construction tube to act as a funnel prior to concrete pour.
 
13.)   Best Square Footing Form
Pour concrete in the top of inverted SQUARE FOOT®.
14.)   Best Square Footing Form
Remove the funnel and spray SQUARE FOOT® off. Trowel concrete.
15.)   Best Square Footing Form
Install anchor bolt to accept bracket as required.
 

Below Grade/Ground Installation Tips:

SF 22 (download PDF)
SF 28 (download PDF)
SF 32 (download PDF)

Above Grade/Ground Installation Tips:

SF 22 (download PDF)
SF 28 (download PDF)
SF 32 (download PDF)

Installation Manual

Installation Manual (download pdf)

Installation Video